Cambiar idioma :
At the Eschweiler waste incineration plant, we have replaced the existing trailing cables with an e-chain® that was developed from the ground up for use in adverse environmental conditions. The installation of the chain on the 70-meter-long crane track placed high demands on logistics and coordination because it was carried out while the incineration lines were in operation.

Servicio al Cliente:
Teléfono: De lunes a viernes, de 8:00 a 20:00
Chat en vivo: 24 horas